Last Sunday we got on and sorted out that kink on Pinesway Bank, that takes you back to Common Lane. Starting by lifting & getting the rough alignment, the old track was removed & newly acquired installed. 4 pairs in total were replaced and the whole job looks vastly different.
Time was taken as we had a large crew to re-align the track on the bank. To be fair, i think we made the panels in the yard & using the Merlo, popped them on the bank, plated and sort of thought that would be good enough. However, it was realised that in the close season, the track here needed moving, mainly as it was just to close to the edge of the embankment. With a crew of 8 on bars & the ballast cleared from the end of the sleepers earlier, it was actually a fairly straight forward job.
Excellent, 2 jobs that when looking through the lens or standing at Pinesway Junction, looked and i hope know-one minds me saying, looked blooming horrendous. Still sorted now. Another job done.