Burning Bridges

Well we built the bridge for hopeful 'new extension' several years ago. Codename Operation Overlord. With this complete, its that simple case of paperwork, paperwork. However, it was realised the bridge had a hump, well was higher than needed and from a distance was quiet obvious. It was built so the sleepers sat on top the concrete piers.

So with a bit of gentle adjustment (CUTTING GAS) we could lower the track so it was fixed to piers with plates. In total dropping the running height by about 4 inches. But more importantly a smother gradient and not such a drop back down to the road for the crossing.

Before




The gentle application on technology

The GLR Umpa Lumpa's
Replacement steel frame in place.

The track restored and fitted. Looks very High Speed Train. There is some steel plates fitted either side now aswell.